more house work
Micah was able to accomplish quite a bit over the weekend on his own. I had two birthday parties to attend so unfortunately i couldn't allocate the time.
Above: New doorway between the foyer and the family room. Widened to allow for a future installation of french doors.
Above: Doorway between kitchen and family room. Still needs drywall on left framework. The doorway was shifted to the right and widened.
Above: Brand new doorway from the dining room into the backyard. This doorway replaced the windows that will be moving to the north side (immediate left wall) of the room. Brick work still needs to be finished on the outside of the house. Molding/insulation around the door needs be installed.
Tuesday, March 31, 2009
Renovations...continued
We are starting to put in some accent pieces in the living spaces in an effort to make that part of the house more livable. The kitchen/dining room will be an ongoing project and will be shielded off from the rest of the house when we need to make a mess.
A few pictures of the latest developments:
Above: the new doorway from the fireplace room into the kitchen. there was a wall where the ladder is sitting. A very short wall (approx. 8") will be added from the opposite side.


Above: on both sides of the foyer (the other side has yet to be installed, need to wait until we install a new door with framework), some nice looking MDF with a molded top is going in to break up the immensity of the wall. Its all primed and ready for paint. There is a color scheme in the works, but the flooring (tile) needs to be chosen yet.
A few pictures of the latest developments:
Above: new trim/moulding and corner pieces around the windows. this really dresses up the windows very nicely.
Above: the same trim/moudling as we used on the windows. this is used around the doorways, windows and major thresholds from the living room side.
New doors to the backyard have been ordered and will replace the windows that are currently on the east wall of the dining room. We are having someone install the doors and must wait until he is available. Some custom mason work will be done to the brick exterior. The windows will move from the east wall to the north wall which will bring a lot more light into the room.
Hopefully we can start priming the walls in the living space this week, move the furniture back and start living in there again...
Hopefully we can start priming the walls in the living space this week, move the furniture back and start living in there again...
Tuesday, March 3, 2009
Its done! well, sort of...
OK, so its not so much done as its finally mostly started. Maybe...
The framing is complete, the drywall is hung (97%). The new counter tops, cabinetry, appliances, windows, doors, etc. are all to come.
Hey, it was a monstrous task and I'm not entirely sure how we completed so much in such little time (cumulatively) , but we did it. Cleaned upmost some less than half of the mess last night.

The framing is complete, the drywall is hung (97%). The new counter tops, cabinetry, appliances, windows, doors, etc. are all to come.
Hey, it was a monstrous task and I'm not entirely sure how we completed so much in such little time (cumulatively) , but we did it. Cleaned up